This property was an existing warehouse property, and we were appointed to refurbish the property following the vacation of the out going tenant and ready for a new tenant, on behalf of the landlord, the works comprised of the following. 

The client also required the energy performance of the property to be increased and to achieve a BREEAM Excellent Rating.

What We Did

  • Removal of asbestos found during the project/
  • Roofing and cladding works
  • Installation of PV’s to the roof
  • Complete replacement of the rear concrete service yard
  • Extensive drainage repairs and redesign of the drainage to the rear yard area.
  • Design and installation of new rainwater harvesting system
  • Extensive design and build M&E installation to meet BREEAM requirements
  • New BMS system.
  • Leak detection and water saving devices throughout
  • Design and installation of plant deck to suit the M&E installation
  • Complete design of the toilet blocks to accommodate the clients requirements within a restrictive space.
  • Design and install new EV system to carpark
  • Design and installation of new windows and entrance glazing
  • Ceramic tiling to the ground floor
  • Complete staircase redesign
  • Complete refurbishment of the office areas
  • Extensive refurbishment of the toilets
  • Complete refurbishment of the warehouse
  • New lights throughout the warehouse and office space
  • New sectional shutter doors, including steelwork alterations
  • Decoration works throughout the warehouse, office and all external cladding
  • Epoxy floor screed throughout the warehouse
  • Design and installation of new fencing and gates
  • Construction of new bug hotels
  • Green roof bike and bin stores
  • Complete external redecoration of the property.
  • Design and installation of new carpark